FR
EN

+ 237 2 22 20 80 59

+ 237 6 79 65 85  15

Blog

Greenpeace and GDA scandal report on Camvert palm oil project in the South Region of Cameroon / GreenPeace Afrique et Green Development Advocates mettent à nu les effets désastreux d’une plantation de palmier à huile de Camvert dans la Région du Sud du Cameroun

Dear all Please find below the links to the recently released scandal report on the Camvert palm oil project and its impacts on forest, biodiversity and communities rights in the Ocean division, south region of Cameroon. The report is a joint publication of Green Development Advocates (GDA) and Greenpeace Africa....

ATELIER DE MOBILISATION DES ORGANISATIONS ET RESEAUX DE LA SOCIETE CIVILE POUR RENFORCER L’ELABORATION ET LA MISE EN ŒUVRE DES ACTIONS DE LUTTE CONTRE LE CHANGEMENT CLIMATIQUE AU CAMEROUN _ Communiqué final

Du 04 au 05 novembre 2021, GDA a mobilisé les organisations et réseaux de la société civile des secteurs de droit humain, des forêts et de l’environnement pour plaider en faveur d’un renforcement de l’élaboration et de la mise en œuvre des actions de lutte contre les changements climatiques au...

WORKSHOP TO MOBILISE CIVIL SOCIETY ORGANISATIONS AND NETWORKS TO STRENGTHEN THE ELABORATION AND IMPLEMENTATION OF CLIMATE CHANGE ACTIONS IN CAMEROON _ Communiqué Final

From the 04 to 05 November 2021, GDA mobilized civil society organisations and networks from the human rights, forestry and environmental sectors to advocate for the strengthening of the development and implementation of actions to combat climate change in Cameroon. Please receive the final communiqué adopted at the end of...

Preparing for the Implementation of the Nationally Determined Contribution in Cameroon 5 years after its Adoption: What is the Outcome? / Préparation de la mise en œuvre de la Contribution Déterminée au niveau National au Cameroun 5 années après son adoption : quel bilan ?

Français plus bas Cameroon has engaged in the revision of its Nationally Determined Contributions (NDCs) within a context where the IPCC, in its last report of August 9, 2021, which shows that greenhouse gas emissions due to human activities have increased temperatures of around 1.1 ° C since the period...

For a sustainable oil palm production in Cameroon: the imperative need to adopt and implement a sustainable national strategy for palm oil production / Pour une production durable de l’huile de palme au Cameroun : l’impérative nécessité d’adopter et de mettre en œuvre une stratégie nationale durable de production de l’huile de palme

Cameroon has since 2014 been engaged in the elaboration of a national Oil Palm Strategy that respects social and environmental norms. Seven years later, the validation and implementation of this strategy document is still pending. Meanwhile, throughout the national territory, there is a huge demand for land for the creation...

Recruitment of a Consultant to Identify and Analyse the Legal and Institutional Barriers to the Participation of Cameroonian CSO in Policies and Decisions related to Natural Resource Management/ Recrutement d’un consultant pour identifier et analyser les barrières juridiques et institutionnelles de la participation des OSC camerounaises aux politiques et décisions relatives à la gestion des ressources naturelles

GDA seeks the services of a consultant to conduct an assessment of existing institutional and legal barriers on CSO involvement in policy and decision making on NRM and to develop a proposed action plan that addresses the identified legal and institutional barriers to CSOs involvement in policy and decision making...

Communities issues and concerns in relation to the Natchigal dam project; Dodgy deal profile on the project created by BankTrack, Green Development Advocates (GDA) & IFI Synergies

NEW #Dodgydeal: Nachtigal hydropower plant, Cameroon Throughout development and construction of this dam, affected community members report inadequate consultation and failure by the company to properly compensate them. Funders must engage with the company to remediate communities’ concerns! This profile https://www.banktrack.org/project/nachtigal_hydropower_plant prepared by Bank Track and IFI Synergy Group which...

Qualifying illegalities in the degazzating process and attribution of 60 000 ha in Campo and Nyété (Cameroon)/Note d’analyse juridique du processus de déclassement et de concession de 60 000 ha de forêt à Campo (Cameroun)

Green Development Advcoates (GDA) has just published a Briefing Note that analyses some irregularities in the legal procedures of de-degazeting and further attributing 60,000 hectares of pristine forest buffering the iconic Campo-Ma’an National Park around the Campo and Nyete Sub Divisions of the Ocean Division – South Region of Cameroon,...

iconfinder_10_171505

Horaires

Nous sommes ouverts de lundi à vendredi.

De 8h30 à 17h30

iconfinder_phone_383093

Téléphone

+ 237 2 22 20 80 59

+ 237 6 79 65 85  15

Copyright © 2020 GDA. Tous les droits sont réservés